HVAC, Electrical and Septic System Update
Lot's of progress was made this week at the house. The ducting for the HVAC system was put into place and the Heater/Fan units were placed in the attic spaces.
![]()
Bonus room HVAC:

The electrical wiring is now in progress with the electrical outlet boxes being put into place. And the holes and tanks were make for the septic system.

And if you look out at the lake closely, you can see the Oasis up on the ridge:

Hope you're having a great Memorial Day weekend!
Posted by Jim at May 28, 2006 2:49 PM