« A Great Weekend of Tennis! | Main | Newly Discovered Beach at Mansfield Dam Park »

May 21, 2006

Plumbing, Doors and HVAC

The work on the house has moved mostly to the inside now. The plumbing has mostly been all put into place and we met with the HVAC folks and aligned on where the units should be located. Also the doors have been hung.

It's been dry the last two weeks so progress is being made. Here's some photos from today.

Front:
Front_052106.jpg

Front Doors:
FrontDoors_052106.jpg

Plumbing shot:
Plumbing_052106.jpg

Bonus Room above garage:
BonusRoom_052106.jpg

Posted by Jim at May 21, 2006 6:17 PM

Trackback Pings

TrackBack URL for this entry:
http://www.austincahills.com/mt/mt-tb.cgi/117