« Claire Wins First Open Tournament | Main | Interior Lighting, Ceiling Fans, Tile, Outdoor Railing »
August 31, 2006
Interior Painting Complete
Work over the last week has focused on painting, caulking, and trim painting. Also the granite countertops were set into place. The inside is really starting to look nice. Here's a look at some of the photos.
Lot's of things are scheduled to happen with flooring, electrical, appliances and more in the coming weeks!
Posted by Jim at August 31, 2006 6:25 PM
Trackback Pings
TrackBack URL for this entry:
http://www.austincahills.com/mt/mt-tb.cgi/143
