September 30, 2006

Stair Railing, Mirrors, Painted Columns

We did an assessment with the builder of what's left, and it looks like the end of October is more realistic that we'll be complete. This was the original estimate when we started building back in March.

Here's the pictures taken yesterday which include the stair railing, bathroom mirrors, and the painted outside columns.
1stFloorStairway092906.jpg
2ndFloorStairway092906.jpg

MasterBathMirror092906.jpg

PaintedColumns092906.jpg

The main electrical line is getting hooked up over the weekend, so much of the electrical work can be finalized.

Posted by Jim at September 30, 2006 2:44 PM