October 15, 2006

Driveway Preparation, Plumbing, Propane Tank

We went out to the house yesterday and took a new batch of photos. The plumbers made great progress as they put the faucet and tub fittings around the house. We now have flowing water from the faucets! Also the driveway is being prepared for the concrete pour which will happen tomorrow weather permitting. And the Propane tank has been delivered and will be plumbed this week.

Flowing Water at Kitchen Sink:
FlowingWater101506.jpg

Installed Kitchen Appliances:
KitchenAppliances101506.jpg

Preparing the Driveway for Concrete:
DrivewayPrep101506.jpg
DrivewayPrep2_101506.jpg

First Floor Stairway Railing:
StairwayRailing101506.jpg

Utility Room Sink:
UtilityRoomSink101506.jpg

3rd Floor Bar Area:
3rdFloorBar101506.jpg

Propane Tank:
PropaneTank101506.jpg

A big push will happen this week as the wood flooring and perhaps carpeting will go in.

Posted by Jim at October 15, 2006 10:20 AM