Amazing progress this week as we wind on down to the end. We've had enough good weather in between storms to get the driveway concrete poured and the landscaping work to begin. It features steps up to the porch, a crushed granite walkway, and rock walls for the beds.

And inside all the electrical hookups could be tested now that electricity is flowing. Carpeting has been put in place on the stairs and 2nd floor, and the flooring for the garage apartment is being finished.

Here's today's batch of photos. Unfortunately I was so excited with the outside progress I don't have good indoor shots. I save that for tomorrow.

Driveway:
Driveway1_101906.jpg
Driveway2_101906.jpg

Front Porch Steps / Rock Wall Beds:
FrontPorchSteps101906.jpg

Crushed Granite Walking Path:
CrushGraniteWalkPath_101906.jpg

Working Front Porch Lights!
FrontPorchLights_101906.jpg

Garage Door Openers
GarageDoorOpeners_101906.jpg

Inside photos tomorrow...

Posted by Jim at October 19, 2006 5:31 PM